Gas Boiler Install – Part III

Well, its Saturday morning, and the gas installers have just turned up (09:00), so the day has started well so far.

So far they’ve drilled a big hole in the wall for the boiler flue, drained the central heating system, hot water cylinder and header tank, and are now draining the radiatiors and fitting the new thermostatic valves.

Alice has her driving theory test this morning, so I hope that it goes well, and she passes.

The engineers are hoping to get the boiler installed and working by the end of today, and will leave it plugged into a wall socket so that we can at least have hot water :oD

Lets see how it goes.

You must be logged in to post a comment.